Rp 91 B Allocated to Develop SWRO in Seribu Islands
Reported by Suparni | Translated by Nugroho Adibrata
Jakarta Water Management Dept is scheduled to develop a sea water resources osmosis (SWRO) on nine residential islands in Seribu Islands. Even, signing the contract on the winning bidder has been done on July 1.
Dated on July 14-15, along with Water Management Sub-dept, we did survey at the location
"Dated on July 14-15, along with Water Management Sub-dept, we did survey at the location. Hopefully, the development will be realized in the near future," expressed Dedi Kustian, Section Head of Raw and Underground Water for Jakarta Water Management Dept, Saturday (7/16).
Karya Island Already Have SWROAccording to him, such contract has been done with PT Promits, KSO PT Antar Benua Suskes Mandiri with project supervisor of PT Dellasonta Moulding Internasional, with contract value at Rp 91.983.323.000, for execution time along 5.5 months.
"Post-location review, his side will do socialization to residents thus the development in the field could be executed and resident needs about clean water can be realized," he added.
He continued, residential islands that will be developed with SWRO are Tidung with capacity of 700 cubic meters per day, Lancang with 250 cubic meters per day, Payung with 10 cubic meters per day, Pramuka with 250 cubic meters per day, Panggang with 500 cubic meters per day, Harapan and Kelapa with 900 cubic meters per day, Kelapa Dua with 100 cubic meters per day, and Sebira with 10 cubic meters per day.